Monday 31 March 2014

Time in Voss for Construction student

Hi, It's been a busy two weeks here in Voss only gotten a chance to update the blog now. Can hardly believe that we left Shetland two weeks today. We have had a jam packed weeks with starting work last week past Thursday, Then going on a trip on satartday on Norway in a Nut shell to see the fjords witch was AMAZING. At work I have been working on a house just up the road from the accommodation witch is handy. Things that I have learned and done have been insulation (glass wool installation witch is very itchy) I have nailed wood to the wall and ceiling. Today I have been nailing a plastic cover to the inside of the wall to keep moister out off the house. I am due to start at Tunge Ting on Thursday witch is the only concrete place in the whole of the Norway, making things like kitchen work tops, bathroom sinks and they have just made recently made a Voss sign that sits out side the library building near the lake.   